Friday, October 30, 2009

The boys are done and the rest of the work will be done by me. So you won't see to many more post for a while. I may throw up a new picture after some thing changes but right now I'm working on gas line water lines and Electrical all at once and it doesn't seem to be going very fast.

A couple of things to note look the yard is somewhat flat again though not graded the way we want it, at least the trench is gone. And so are the big hunks of root.

That trench was there for so long I thought it might never be covered up. There are still two small holes left one in front of the main house and on on the side of the Club House. When I finish the gas line they will install the meter and I can cover those holes also.




Sunday, October 4, 2009


Not much has been happening that you can see. The trench has conduit and wires and will be covered over tomorrow. It will be nice to have that taken care of. As you can see the first coat of primer is on won't be long till the top coat is applied, forecast for this coming week is warn and dry perfect for painting. Inside I've been working on some plumbing a slow process for me but I'm making head way. will post more pics when the trench is gone and the final color is applied.